“I want to express my admiration and gratitude to Marta Alcumbrac and Kevin Mulcahy, who have tirelessly assisted (THE LFCSA BOARD) and taken the lead in shepherding this project through the obstacle course required by law. Kevin, our lead architect, has guided the process through all of the planning offices at the City level, gaining the necessary approval at each step of the process.”

Karin Newlin - L.F.C.S.A. Principal

All rights are reserved by studioTBD, except with prior written permission, please contact info@co-lab-orative.com

with our detailed history representing lFCSA and our commitment to managing the important details of EACH SITE, studioTBD was able to guide every CRITiCAL aspect of this project before passing the project back to the Board almost a year later, to SEE the fun begin with THE  limited build-out of lFCSA’s 1st permanent home.


the final of twenty-two projects produced for lFCSA

PREPAREDNESS + RESEARCH + PLANNING + DESIGN EXCELLENCE + PROJECT MANAGEMENT

CO-LA(B)- o r a t i v e

work