All rights are reserved by studioTBD, except with prior written permission, please contact info@co-lab-orative.com

as the project entered design development including the lower floor, incorporatinG of core structural systems, the  owner, decided to incorporate a second stand-alone single story pre-fab kit  provided by rocio romero called the LV-garage. studioTBD meshed the buildings, foundation and lower floor design and all construction.

CO-LA(B)- o r a t i v e

work